01 / 05 · openBIM, in the browser

ZEROBiE: openBIM in the browser. Your IFC, open on any screen.

Your IFC, open on any screen.

Keep scrolling and watch a real 343 MB model put itself together, right here in your browser. That's the whole idea: the heavy file is converted once, so nobody on your team installs a thing.

Now building

SITE

±0.0 m

Two minutes · every module

One building. One identity. Every app.

The whole platform in one take: files, checks, requirements and the model, all talking about the same element.

zerobie · showreel
Showreel · includes features in development

01 · The context

Six reasons BIM work is harder than it should be.

Turn a card over to see what ZEROBiE does about it - today, not on a roadmap.

02 · The drawing set

One place for the model, and everything said about it.

Six tools that share one project, one set of files and one record of who did what. Every sheet is drawn from the same real building - move over one and the print comes to life.

Sixty5 rendered for 3D Viewer: Picked element · IFC colours
Sixty5 · Picked element · IFC colours1:500
Sheet A-101Rev C01

3D Viewer

Open the model. Not a screenshot of it.

  • Section, measure and isolate in the browser
  • Click any element for its properties
  • Nothing to install, ever
Sixty5 rendered for CDE: Work in progress
Sixty5 · Work in progress1:500
Sheet A-102Rev C01

CDE

One home for files, revisions and the people who touch them.

  • WIP → Shared → Published → Archived
  • Every revision kept, every change recorded
  • Roles per project, previews for everyday files
Sixty5 rendered for Assure: One element under inspection
Sixty5 · One element under inspection1:500
Sheet A-103Rev C01

Assure

Find the problems before your client does.

  • Quality rules, grouped by severity
  • IFC checks against buildingSMART's published rules
  • Each result dated and kept in History
Sixty5 rendered for IDS Ruler: Nineteen storeys, taken apart
Sixty5 · Nineteen storeys, taken apart1:500
Sheet A-104Rev C01

IDS Ruler

Write your requirements once. Check every model against them.

  • Rules without hand-written XML
  • Import and export standard IDS files
  • Results that name the element
Sixty5 rendered for Element history: Clay · one element's record
Sixty5 · Clay · one element's record1:500
Sheet A-105Rev C01

Element history

Every wall remembers where it has been.

  • One element across every model version
  • Its findings, resolved ones included
  • Who changed what, and when
Sixty5 rendered for ZI assistant: X-ray · everything inside
Sixty5 · X-ray · everything inside1:500
Sheet A-106Rev C01

ZI assistant

Ask how, get the page that explains it.

  • Answers quote the handbook, with sources
  • Project data only if you switch it on
  • Off by default. Your call.

03 · Try to cheat

Go on. Quietly change the record.

Every recorded event in a ZEROBiE project is sealed together with the one before it. Change one word in any link and watch what happens to everything after it.

Chain status

INTACT

An illustration running in your browser with made-up events. The real record is sealed inside the database as each event is written; the application never computes a seal, so it can't forge one.

  1. 09:02

    #1

    Anna (architect)

    prevgenesis

    b9024d30…013asealed
  2. 09:40

    #2

    Anna (architect)

    prevb9024d30…013a

    683028f7…1d53sealed
  3. 11:15

    #3

    Tom (structures)

    prev683028f7…1d53

    0790a022…69c8sealed
  4. 14:30

    #4

    Priya (info manager)

    prev0790a022…69c8

    6a35f1ff…37fasealed
  5. 16:05

    #5

    Priya (info manager)

    prev6a35f1ff…37fa

    674956e4…94e8sealed

04 · Straight talk

What we say about ISO 19650. And what we won't.

Plenty of software says it's certified. Here's the honest version, so you can quote us in a tender without a lawyer wincing.

  1. State 1 · WIP

    Work in progress

    Still being worked on. Not for anyone to rely on yet.

  2. State 2 · S

    Shared

    Out for coordination. Others can look and comment.

  3. State 3 · P

    Published

    Approved for use. This is the one to build from.

  4. State 4 · A

    Archived

    Kept for the record. Never quietly deleted.

Sheet S-401 · Claims registerChecked against context/approved-claims · Rev C01
ApprovedWhat we say
  1. S-01

    Designed to support information management in accordance with BS EN ISO 19650-2.

  2. S-02

    A CDE with an ISO 19650-shaped workflow: WIP, Shared, Published, Archived.

  3. S-03

    Models are checked against buildingSMART's published IFC rules, reported in four separate layers.

  4. S-04

    IFC-native: IFC2X3, IFC4 and IFC4X3. Open formats in, open formats out.

RejectedWhat we won't
  1. “Certified to ISO 19650”

    NoteISO writes standards and certifies nothing, so that badge can't exist - whoever offers it.

  2. “Fully compliant CDE”

    NoteConformity belongs to the appointing and appointed parties and their own processes. Software can help; it can't hold it for you.

  3. A score with no date

    NoteA check result means little without the ruleset it used and when it ran. Ours always carry both.

05 · Open by default

Your data was never ours to lock up.

openBIM isn't a badge we add at the end. Open formats go in, open results come out, and nothing in between holds your information hostage.

In

IFC2X3

Read natively

IFC4

Read natively

IFC4X3

Read natively

IDS

Your requirements, imported

One model · one record
Out

Your files

Byte for byte, as uploaded

IDS

Exported in the open format

4-layer report

Never averaged into one number

The model

Light enough for any browser

06 · The vision

One core. Everything else in orbit.

Every capability works from the same model and the same record. The inner ring is live today; the outer ring is where ZEROBiE is heading.

Live today

Planned

Clash detectionGIS integrationMaster model managementVR · AR · MRDigital twin4D/5D schedulingSemantic repairDocument editorCommunication hubPresenterData visualizerERP moduleParametric engineEnergy simulation
Live today Planned · indicative, may changeSee the roadmap

07 · Who it's for

Built around the people in an appointment, not around a feature list.

Pick a role. Illustrative scenarios - not customer case studies or measured results.

Information managers

Set the rules once. Let every model meet them.

  1. 1Write the project's information requirements in the IDS Ruler - no XML by hand.
  2. 2Every model that arrives is checked against them, and against buildingSMART's published IFC rules.
  3. 3Files move WIP → Shared → Published with each decision recorded, by whom and when.

08 · Your turn

Bring a model. See it in a minute.

Opening your next perspective

Loading ZEROBiE